FIELDS OF USE
It is used as a dust proofer and protective for floors and concrete surfaces.
APPLICATION
Two coats should be applied when the cement is completely dry – after at least 28 days. Apply a third coat for maximum protection. The surface must be free from grease, release agents or silicone products, which can affect the effectiveness of the treatment. Complete cross-linking and therefore the maximum performance of the product is reached after 10-12 days. To prepare the product, thoroughly mix component A (impregnating agent) with catalyst B, in a ratio of 2: 1 by weight. The mixed product is ready to use. If necessary, dilute with an epoxy thinner, according to the absorption of the treated surface. Apply a second coat after no more than 36 hours from the first coat, using the same procedure. The same procedure should be used for the third coat, if applied.